Client Spotlight: Christ The Center Ministries
Projects Completed: Ground-up construction of Nursery School, Primary School, Chapel/Main Hall
Project Duration: 13 Months (Design and Build)
Project Year: 2023 – 2024
Work Undertaken: General Construction (Structural works, cosmetic work, electrical and mechanical engineering were all done by Crux Engineering)
Crux Engineering & Construction Limited has performed all of CTCM’s work as it has developed as an organization over the last 5 years. We have designed and built their Nursery, Primary and Secondary school campuses to completion.
- The buildings are all based on agreemental standard (code). This is a compressed brick (interlocking) bricks system, the bricks are called hydro foam blocks, One of the most robust engineering structures used with a compressive strength varying between 6.5 mpa upto 9 mpa depending on the material source.
- Used on storeyed structure, earthquake and weather resistant